| Time to complete: | 45 days |
| Cost to complete: | INR 10000 |
| Comment: | Land use permit is classified as Residential zones and Light industrial zone. If the land is in the residential zone than residential permit is required. In the case of light industrial zone, where the power consumption is more than 50 horse power, indust |
| Time to complete: | 1 day, simultaneous with previous procedure |
| Cost to complete: | INR 80 (INR 30 for the affidavit and INR 50 for the indemnity bond) |
| Comment: | |
| Time to complete: | 5 days |
| Cost to complete: | INR 21,000 (INR 1.5 per square feet) |
| Comment: | The company must submit the application in Form A to the Corporation of Chennai along with the following documents:
a) A detailed site plan with the site distinguished clearly and the proposed structure located within the site, indicating specifically the |
| Time to complete: | 45 days |
| Cost to complete: | INR 12,025 (INR 90 –95 per 10 square meters) |
| Comment: | Application will be scrutinized with reference to the land use for which site has been designated under the Master Plan or the Detailed Development Plan read with the Development Control Rule corresponding to that particular use zone.
If the application s |
| Time to complete: | 28 days |
| Cost to complete: | INR 5000 |
| Comment: | |
| Time to complete: | 1 day (included in previous procedure) |
| Cost to complete: | no charge |
| Comment: | |
| Time to complete: | 28 days |
| Cost to complete: | no charge |
| Comment: | |
| Time to complete: | 1 day (included in previous procedure) |
| Cost to complete: | no charge |
| Comment: | |
| Time to complete: | 30 days |
| Cost to complete: | INR 7500 |
| Comment: | |
| Time to complete: | 1 day (included in previous procedure) |
| Cost to complete: | no charge |
| Comment: | |
| Time to complete: | 15 days |
| Cost to complete: | INR 5000 |
| Comment: | |
| Time to complete: | 1 day (included in previous procedure) |
| Cost to complete: | no charge |
| Comment: | |
| Time to complete: | 15 days |
| Cost to complete: | INR 3500 |
| Comment: | |
| Time to complete: | 45 days |
| Cost to complete: | INR 75,000 (INR 50,000-100,000) |
| Comment: | |
| Time to complete: | 1 day (included in previous procedure) |
| Cost to complete: | no charge |
| Comment: | |
| Time to complete: | 30 days |
| Cost to complete: | INR 7500 |
| Comment: | |
| Time to complete: | 7 days |
| Cost to complete: | INR 2000 |
| Comment: | |
| Time to complete: | 30 days |
| Cost to complete: | INR 2500 |
| Comment: | |
| Time to complete: | 1 day (included in previous procedure) |
| Cost to complete: | no charge |
| Comment: | |
| Time to complete: | 15 days |
| Cost to complete: | INR 2500 |
| Comment: | In most of the cities we study in India, there are both completion permit and occupancy permit. The completion permit applies only to commercial buildings. For residential buildings only the occupancy permit is relevant. |
| Time to complete: | 1 day (included in previous procedure) |
| Cost to complete: | no charge |
| Comment: | |