Topics DB 2017 Rank DB 2016 Rank info_outline Change in Rank DB 2017 DTF (% points) info_outline DB 2016 DTF (% points) info_outline Change in DTF (% points) info_outline
Overall 71 70 down
1
65.55 65.39 down
0.16
Starting a Business 153 143 down
10
76.21 76.21
-
Dealing with Construction Permits 50 53 up
3
74.81 73.70 up
1.11
Getting Electricity 125 124 down
1
59.25 59.34 down
0.09
Registering Property 70 69 down
1
67.27 67.25 up
0.02
Getting Credit 75 70 down
5
55.00 55.00
-
Protecting Minority Investors 81 78 down
3
55.00 55.00
-
Paying Taxes 55 52 down
3
80.58 80.58
-
Trading across Borders 51 51
-
85.93 85.93
-
Enforcing Contracts 132 130 down
2
50.95 50.95
-
Resolving Insolvency 64 64
-
50.53 49.97 up
0.56

Positive= Doing Business reform making it easier to do business.Negative= Change making it more difficult to do business.

DB 2017 Rank:

50

DB 2016 Rank:

53

Change in Rank:

up3

DB 2017 DTF (% points):

74.81

DB 2016 DTF (% points):

73.70

Change in DTF (% points):

up1.11

STANDARDIZED WAREHOUSE
Estimated value of warehouse BWP 3,177,649
City Gaborone
Indicator Botswana Sub-Saharan Africa OECD high income
Procedures (number) info_outline 17 14.5 12.1
Time (days) info_outline 100 155.6 152.1
Cost (% of warehouse value) info_outline 0.3 7.6 1.6
Building quality control index (0-15) info_outline 10.5 7.2 11.3
  • Measure of efficiency
    No. Procedure Time to Complete Associated Costs
    1

    Obtain a site plan from the Department of Surveys and Maps

    Agency: Department of Surveys and Maps

    Before submitting the project brief to the Department of Environmental Affairs, BuildCo must obtain a site plan from the Department of Surveys and Maps.

    1 day BWP 2
    2

    Submit project brief to Department of Environmental Affairs

    Agency: Department of Environmental Affairs

    Prior to 2011, all developers were required to undergo a Preliminary Environmental Impact Assessment (PEIA). However, after the adoption of the Environmental Assessment Act of 2011 and Environmental Assessment Regulations of 2012, BuildCo must only submit a project brief. Based on the project brief, the Department can screen a project and decide whether the project should (1) be allowed to proceed without being subjected to a detailed Environmental Impact Assessment, (2) require a detailed Environmental Impact Assessment Study prior to project implementation, or (3) develop an Environmental Management Plan prior to project implementation.

    7 days BWP 10
    * 3

    Apply for sewage connection

    Agency: Water Utilities Corporation

    Before construction starts, the City Council must approve the sewage connection. The investor must visit the Water Utilities Corporation (WUC) in person. When the investor comes to WUC, the investor is given forms to fill out, which is done on the spot. The investor must also bring detailed plans, showing where the connection will be made. The representatives of WUC examine the plans and filled out forms, and approve the plans on the spot. If the plans are not in order, then the approval is denied and the investor must return when the plans are in compliance with regulations.

    1 day no charge
    4

    Receive site inspection

    Agency: Water Utilities Corporation

    After the investor applies for a sewage connection, a representative from the Water Utilities Corporation comes out to inspect the building site to verify that the building plans approved in the application procedure correspond to the actual construction site. The inspection occurs after the sewage connection application has been approved.

    1 day no charge
    5

    Request and obtain planning and building permit from the Gaborone City Council

    Agency: Gaborone City Council

    Gaborone City Council approval is required to obtain a planning and building permit. The council examines the drawings and pays a site visit to ensure compliance with regulations and restrictions on health, sewer, fire, building, and planning. For any construction over 1,000 sq. m., the City Council forwards the filed documents for the approval of the Department of Town and Regional Planning (DTRP). Thus, BuildCo never enters into direct contact with the department.

    A certified copy of the title deed is also required. There are no restrictions on how recent the copy of the deed should be. It is assumed the BuildCo already owns the land that it intends to build on.

    A permit is valid for 24 months from the date of issue. If work has not started within that period, the permit will no longer be valid. However, if a written application for an extension is submitted, the validity of the permit can be extended for another 12 months.

    60 days BWP 2,150
    6

    Receive trench inspection from Gaborone City Council

    Agency: Gaborone City Council

    Once construction works have begun, a written notice no less than three working days (excluding Saturday, Sunday or Public Holiday) in advance should be given for every mandatory inspection. This inspection is conducted after the completion of every stage of construction. Below is the list of every stage:

    • Before the covering of an excavation for a foundation;
    • Before the covering of the foundation;
    • Before the covering of a damp-proof course;
    • Laying concrete or other material over a site; and
    • Before a drain or sewer to which these Regulations apply is covered in any way

    It is not advisable to perform construction without inspections; builders run the risk of being ordered to demolish a defective structure.

    1 day no charge
    7

    Receive labor inspection from Department of Labor

    Agency: Department of Labor

    The Department of Labor Conducts ongoing inspections to check the site workers’ work permit documentation to ensure they are not undocumented illegal immigrants. Construction must stop if sanitary or safety standards are found to be below the required standards and if illegal workers are found on site.

    1 day no charge
    8

    Receive inspection from Department of Health and Safety Standards - I

    Agency: Department of Health and Safety Standards

    The Department of Health and Safety Standards conducts ongoing inspections to check health and safety standards on the construction site. Construction must stop if sanitary or safety standards are found to be below the required standards.

    1 day no charge
    9

    Receive inspection from Department of Health and Safety Standards - II

    Agency: Department of Health and Safety Standards

    The Department of Health and Safety Standards conducts ongoing inspections to check health and safety standards on the construction site. Construction must stop if sanitary or safety standards are found to be below the required standards.

    1 day no charge
    10

    Receive inspection from Gaborone City Council to pass damp-proof course (DPC)

    Agency: Gaborone City Council

    1 day no charge
    11

    Receive wall inspection from Gaborone City Council

    Agency: Gaborone City Council

    1 day no charge
    12

    Receive roof inspection from Gaborone City Council

    Agency: Gaborone City Council

    1 day no charge
    13

    Receive drainage/sewerage inspection from Gaborone City Council

    Agency: Gaborone City Council

    1 day no charge
    14

    Notify the Gaborone City Council of the completion of the building

    Agency: Gaborone City Council

    BuildCo must submit a written notice to the Gaborone City Council not more than seven days after the completion of building work.

    1 day no charge
    15

    Receive final inspection

    Agency: Gaborone City Council

    1 day no charge
    16

    Obtain water and sewage connection from Water Utilities Corporation

    Agency: Water Utilities Corporation

    Once the final inspection has been completed, representatives of the Water Utilities Corporation come out to inspect the site and to connect water and sewage systems.

    21 days BWP 6,900
    * 17

    Obtain occupation permit

    Agency: Gaborone City Council

    This document allows BuildCo to occupy the building upon completion.

    7 days no charge

    * Takes place simultaneously with previous procedure.

  • Measure of quality
    Answer Score
    Building quality control index (0-15) 10.5
    Quality of building regulations index (0-2) 1.5
    How accessible are building laws and regulations in your economy? (0-1) Free of charge; Not easily accessible. 0.5
    Which requirements for obtaining a building permit are clearly specified in the building regulations or on any accessible website, brochure or pamphlet? (0-1) List of required documents; Fees to be paid; Required preapprovals. 1.0
    Quality control before construction index (0-1) 0.0
    Which third-party entities are required by law to verify that the building plans are in compliance with existing building regulations? (0-1) Civil servant reviews plans. 0.0
    Quality control during construction index (0-3) 2.0
    What types of inspections (if any) are required by law to be carried out during construction? (0-2) Inspections at various phases. 1.0
    Do legally mandated inspections occur in practice during construction? (0-1) Mandatory inspections are always done in practice. 1.0
    Quality control after construction index (0-3) 3.0
    Is there a final inspection required by law to verify that the building was built in accordance with the approved plans and regulations? (0-2) Yes, final inspection is done by government agency. 2.0
    Do legally mandated final inspections occur in practice? (0-1) Final inspection always occurs in practice. 1.0
    Liability and insurance regimes index (0-2) 0.0
    Which parties (if any) are held liable by law for structural flaws or problems in the building once it is in use (Latent Defect Liability or Decennial Liability)? (0-1)  No party is held liable under the law. 0.0
    Which parties (if any) are required by law to obtain an insurance policy to cover possible structural flaws or problems in the building once it is in use (Latent Defect Liability Insurance or Decennial Insurance)? (0-1) No party is required by law to obtain insurance . 0.0
    Professional certifications index (0-4) 4.0
    What are the qualification requirements for the professional responsible for verifying that the architectural plans or drawings are in compliance with existing building regulations? (0-2) Minimum number of years of experience; University degree in architecture or engineering; Being a registered architect or engineer; Passing a certification exam. 2.0
    What are the qualification requirements for the professional who supervises the construction on the ground? (0-2) Minimum number of years of experience; University degree in engineering, construction or construction management; Being a registered architect or engineer; Passing a certification exam. 2.0