Eritrea

Ease of Doing Business in

Eritrea

This page summarizes Doing Business 2016 data for Eritrea. The first section presents the Ease of Doing Business rank (out of 189 economies) and the distance to frontier (DTF)** measure, overall and by topic. The second section summarizes the key indicators for each topic benchmarked against regional averages.

Economy Overview

 
Region Sub-Saharan Africa
Income Category Low income
Population 6,536,176
GNI Per Capita (US$) 530
City covered Asmara
Doing Business 2016 Rank Doing Business 2015 Rank
X

DOING BUSINESS 2015 RANK

Last year's rankings are adjusted. They are based on 10 topics and reflect data corrections.

Change in Rank
189 189 0

Doing Business 2016 DTF (% points)
X

DISTANCE TO FRONTIER SCORE

The distance to frontier score shows how far on average an economy is at a point in time from the best performance achieved by any economy on each Doing Business indicator since 2005 or the third year in which data for the indicator were collected. The measure is normalized to range between 0 and 100, with 100 representing the frontier. Read more...

Doing Business 2015 DTF (% points)
X

DISTANCE TO FRONTIER SCORE

The distance to frontier score shows how far on average an economy is at a point in time from the best performance achieved by any economy on each Doing Business indicator since 2005 or the third year in which data for the indicator were collected. The measure is normalized to range between 0 and 100, with 100 representing the frontier. Read more...

Change in DTF (% points)
X

DISTANCE TO FRONTIER SCORE

The distance to frontier score shows how far on average an economy is at a point in time from the best performance achieved by any economy on each Doing Business indicator since 2005 or the third year in which data for the indicator were collected. The measure is normalized to range between 0 and 100, with 100 representing the frontier. Read more...

27.61 27.40 down 0.21

Getting Electricity

X

Getting Electricity

The challenges required for a business to obtain a permanent electricity connection for a newly constructed warehouse are shown below. Included are the number of steps, time, and cost.

DB 2016 Rank 142 DB 2015 Rank
X

DOING BUSINESS 2015 RANK

Last year's rankings are adjusted. They are based on 10 topics and reflect data corrections.

144 Change in Rank up2
DB 2016 DTF (% points)
X

DISTANCE TO FRONTIER SCORE

The distance to frontier score shows how far on average an economy is at a point in time from the best performance achieved by any economy on each Doing Business indicator since 2005 or the third year in which data for the indicator were collected. The measure is normalized to range between 0 and 100, with 100 representing the frontier. Read more...

53.43 DB 2015 DTF (% points)
X

DISTANCE TO FRONTIER SCORE

The distance to frontier score shows how far on average an economy is at a point in time from the best performance achieved by any economy on each Doing Business indicator since 2005 or the third year in which data for the indicator were collected. The measure is normalized to range between 0 and 100, with 100 representing the frontier. Read more...

52.71 Change in DTF (% points)
X

DISTANCE TO FRONTIER SCORE

The distance to frontier score shows how far on average an economy is at a point in time from the best performance achieved by any economy on each Doing Business indicator since 2005 or the third year in which data for the indicator were collected. The measure is normalized to range between 0 and 100, with 100 representing the frontier. Read more...

up0.72
Indicator Eritrea Sub-Saharan Africa OECD high income
Procedures (number)
X

Procedures (number)

The number of procedures to obtain a permanent electricity connection. A procedure is defined as any interaction of the company employees or the company’s main electrician with external parties.

View methodology

5 5.4 4.8
Time (days)
X

Time (days)

The number of days to obtain a permanent electricity connection. The measure captures the median duration that the electricity utility and experts indicate is necessary in practice, rather than required by law, to complete a procedure.

View methodology

59.0 130.1 77.7
Cost (% of income per capita)
X

Cost (% of income per capita)

The cost is recorded as a percentage of the economy’s income per capita. Costs are recorded exclusive of value added tax.

View methodology

2,846.1 4,075.6 65.1
Reliability of supply and transparency of tariff index (0-8)
X

Reliability of supply and transparency of tariff index (0-8)

The reliability of supply and transparency of tariffs index is calculated on the basis of the following six components: duration and frequency of power outages, tools to monitor power outages, tools to restore power supply, regulatory monitoring of utilities’ performance, financial deterrents aimed at limiting outages, and transparency and accessibility of tariffs.

View methodology

0.0 0.9 7.2
No. Procedure Time to Complete Associated Costs
1 Hire specialized electrician to inspect internal wiring 1 calendar day USD 800
2 Request and receive internal wiring inspection by utility 14 calendar days USD 0
3 Submit application for connection and await external inspection 7 calendar days USD 10
4 Receive inspection and estimate and sign supply contract 7 calendar days USD 14,274.47
5 Receive external works, meter installation and electricity flow 30 calendar days USD 0
  