São Tomé and Príncipe

Ease of Doing Business in

São Tomé and Príncipe

This page summarizes Doing Business 2013 data for São Tomé and Principe. The first table lists the overall "Ease of Doing Business" rank (out of 185 economies) and the rankings by each topic. It also lists the economy's distance to frontier (DTF)** measure. The rest of the tables summarize the key indicators for each topic and benchmark against regional and high-income economy (OECD) averages.

Economy Overview

Region Sub-Saharan Africa
Income Category Lower middle income
Population 168,526
GNI Per Capita (US$) 1,360
Doing Business 2013 Rank Doing Business 2012 Rank Change in Rank
160 157 down -3

Doing Business 2013 DTF** (% points) Doing Business 2012 DTF** (% points) Improvement in DTF** (% points)
45.8 45.8 0.0
Topic Rankings DB 2013 Rank DB 2012 Rank Change in Rank
Starting a Business 100 108 up 8
Dealing with Construction Permits 91 73 up -18
Getting Electricity 72 71 up -1
Registering Property 161 162 up 1
Getting Credit 180 180 No change
Protecting Investors 158 155 up -3
Paying Taxes 144 138 up -6
Trading Across Borders 89 90 up 1
Enforcing Contracts 181 180 up -1
Resolving Insolvency 164 162 up -2

Economy Profile

1681.1 KB pdf file

Download Now

Dealing with Construction Permits

Info

Shown below are the procedures, time, and costs to build a warehouse, including obtaining necessary licenses and permits, completing required notifications and inspections, and obtaining utility connections.

DB 2013 Rank 91 DB 2012 Rank 73 Change in Rank down-18
DB 2013 DTF** (% points) 78.8 DB 2012 DTF** (% points) 79.8 Improvement in DTF** (% points) down-1.0
Indicator São Tomé and Príncipe Sub-Saharan Africa OECD

The total number of procedures required to build a warehouse. A procedure is any interaction of the company’s employees or managers with external parties.

View methodology
Procedures (number)
13 15 14

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.

View methodology
Time (days)
118 196 143

Cost is recorded as a percentage of the economy’s income per capita. Only official costs are recorded.

View methodology
Cost (% of income per capita)
386.7 751.6 78.7
No. Procedure Time to Complete Associated Costs
1 Request and obtain Construction Appraisal from the Geographic and Cadaster Directorate. 14 days USD 135
2 Request and obtain Building permit from the Directorate of Urbanism and Public Construction 21 days STD 25,000,000
3 Request water connection 1 day no charge
4 Receive inspection for water 1 day no charge
5 Connect to water services 7 days USD 124
6 Request and connect to phone services 14 days USD 23
7 Request and Receive Use Permit 14 days STD 3,750,000
8 Register the Building in the Fiscal Property Registry 1 day no charge
9 Receive inspection from Fiscal Property Registry 1 day USD 10
10 Obtain a Fiscal Property Certificate 21 days no charge
11 Request registration of building at the Land Registry 1 day no charge
12 Receive site inspection by the Land Registry 1 day no charge
13 Pay fees and Obtain Land Registry Note 21 days STD 67,084,420

** The distance to frontier (DTF) measure shows the distance of each economy to the "frontier," which represents the highest performance observed on each of the indicators across all economies included in Doing Business since each indicator was included in Doing Business. An economy’s distance to frontier is indicated on a scale from 0 to 100, where 0 represents the lowest performance and 100 the frontier. Read more...

Explore Economy Data