South Africa

Ease of Doing Business in

South Africa

This page summarizes Doing Business 2013 data for South Africa. The first table lists the overall "Ease of Doing Business" rank (out of 185 economies) and the rankings by each topic. It also lists the economy's distance to frontier (DTF)** measure. The rest of the tables summarize the key indicators for each topic and benchmark against regional and high-income economy (OECD) averages.

Economy Overview

Region Sub-Saharan Africa
Income Category Upper middle income
Population 50,586,757
GNI Per Capita (US$) 6,960
Doing Business 2013 Rank Doing Business 2012 Rank Change in Rank
39 41 down 2

Doing Business 2013 DTF** (% points) Doing Business 2012 DTF** (% points) Improvement in DTF** (% points)
74.6 73.5 down 1.1
Topic Rankings DB 2013 Rank DB 2012 Rank Change in Rank
Starting a Business 53 43 up -10
Dealing with Construction Permits 39 38 up -1
Getting Electricity 150 148 up -2
Registering Property 79 78 up -1
Getting Credit 1 1 No change
Protecting Investors 10 10 No change
Paying Taxes 32 34 up 2
Trading Across Borders 115 145 up 30
Enforcing Contracts 82 83 up 1
Resolving Insolvency 84 81 up -3

Economy Profile

1329.7 KB pdf file

Download Now

Dealing with Construction Permits

Info

Shown below are the procedures, time, and costs to build a warehouse, including obtaining necessary licenses and permits, completing required notifications and inspections, and obtaining utility connections.

DB 2013 Rank 39 DB 2012 Rank 38 Change in Rank down-1
DB 2013 DTF** (% points) 82.1 DB 2012 DTF** (% points) 82.1 Improvement in DTF** (% points) 0.0
Indicator South Africa Sub-Saharan Africa OECD

The total number of procedures required to build a warehouse. A procedure is any interaction of the company’s employees or managers with external parties.

View methodology
Procedures (number)
13 15 14

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.

View methodology
Time (days)
127 196 143

Cost is recorded as a percentage of the economy’s income per capita. Only official costs are recorded.

View methodology
Cost (% of income per capita)
33.4 751.6 78.7
No. Procedure Time to Complete Associated Costs
1 Submit site development/ building plans to Municipality for approval 90 days ZAR 14,006
* 2 Submit copy of building plans to TELKOM to apply for telephone connection 20 days ZAR 600
* 3 Submit occupational health and safety plan 7 days no charge
* 4 Pay road repair deposit 30 days ZAR 1,500
5 Submit notification of completion of excavation/ foundation work 1 day no charge
6 Receive inspection of excavation and foundations work 1 day no charge
7 Submit notification of completion of sewage/ plumbing work 1 day no charge
8 Receive inspection of sewage and plumbing 1 day no charge
9 Submit certificate of compliance (plumbing, sewage) 1 day no charge
10 Apply for water and sewerage connection 30 days ZAR 1,350
* 11 Obtain telephone connection 1 day ZAR 1,650
12 Receive final inspection by municipal authorities 1 day no charge
13 Obtain Occupational Certificate 1 day no charge
* Takes place simultaneously with another procedure.

** The distance to frontier (DTF) measure shows the distance of each economy to the "frontier," which represents the highest performance observed on each of the indicators across all economies included in Doing Business since each indicator was included in Doing Business. An economy’s distance to frontier is indicated on a scale from 0 to 100, where 0 represents the lowest performance and 100 the frontier. Read more...

Explore Economy Data


- OR -

Close