Albania

Ease of Doing Business in

Shkodra, Albania - South East Europe

This page summarizes Doing Business data for Shkodra, Albania. The first table shows its rank among 22 cities/regions in South East Europe. The rest of the tables summarize the key indicators for each topic and benchmark against regional and high-income economy (OECD) averages.

Economy Overview

Region
Income Category
Population
GNI Per Capita (US$)
Ease of Doing Business Rank among 22 cities in South East Europe Top city in South East Europe
n.a. n.a.
Topic Rankings Rank among 22 cities in South East Europe Top city in South East Europe
Starting a Business 8 Skopje, Macedonia, FYR
Dealing with Construction Permits 3 Niksic, Montenegro
Registering Property 9 Chisinau, Moldova
Enforcing Contracts 11 Zrenjanin, Serbia

Subnational Data


Dealing with Construction Permits

Info

Shown below are the procedures, time, and costs to build a warehouse, including obtaining necessary licenses and permits, completing required notifications and inspections, and obtaining utility connections.

Indicator Shkodra, Albania Eastern Europe & Central Asia OECD

The total number of procedures required to build a warehouse. A procedure is any interaction of the company’s employees or managers with external parties.

View methodology
Procedures (number)
21 19 14

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.

View methodology
Time (days)
176 226 143

Cost is recorded as a percentage of the economy’s income per capita. Only official costs are recorded.

View methodology
Cost (% of income per capita)
382.7 486.7 78.7
No. Procedure Time to Complete Associated Costs
1 Request and obtain a recent property ownership certificate and a copy of the land plot map from the Immovable Property Registration Office (IPRO) 7 days ALL 1,020 (ALL 400 for ownership certificate + ALL 400 for map + ALL 100 service fee + ALL 120 mailing fee)
* 2 Request and obtain extract of master plan and general plan of the plot from the municipal Urban Planning Department 23 days No cost
* 3 Request and obtain document attesting that the firm has no unpaid taxes or fees from the municipal tax office 2 days No cost
* 4 Request and obtain opinion of the municipal Urban Planning Department 3 days No cost
* 5 Request and obtain updated information on the closest connection point to the water network from the local water authority (Ndërmarrja e Ujësjellësit dhe Kanalizimeve Sh.A. Shkodër) 3 days No cost
* 6 Request and obtain environmental approval from the Regional Agency of Environmental Protection (Agjencia Rajonale e Ruajtjes së Mjedisit—ARM) 3 days ALL 2,000
* 7 Request and obtain updated information on the closest connection point to the electricity grid from the electricity distributor (CEZ Shpërndarje Sh. A. Shkodër) 5 days ALL 500
* 8 Request and obtain Fire and Rescue Department approval (Policia e Mbrojtjes nga Zjarri dhe Shpëtimit - PMNZSH) 15 days ALL 10,000
9 Request and obtain "buildable land" permit from the Technical Council of the municipal Urban Department (Këshilli Teknik) and the municipal Territorial Adjustment Council (TAC) 45 days No cost
10 Apply and obtain building permit from the municipal Territorial Adjustment Council (TAC) 30 days No cost
* 11 Pay building permit fees at a commercial bank or post office 1 day ALL 1,200,000 (3% of investment value)
12 Request inspection of property boundaries by licensed surveyor 1 day ALL 3,000
13 Request inspection of construction foundations 1 day ALL 3,000
14 Request on-site inspection of the completed construction skeleton 1 day ALL 3,000
15 Request on-site inspection of the adjustment of the surroundings of the building according to the initial drawings 1 day ALL 3,000
* 16 Request connection and connect to electrical power grid (CEZ Shpërndarje sh.a. Shkodër) 25 days ALL 40,000
* 17 Request connection and connect to water and sewage services (Ndërmarrja e Ujësjellësit dhe Kanalizimeve Sh.A. Shkodër) 14 days ALL 25,000
* 18 Request connection and connect to telecommunications network (ALBtelecom) 10 days ALL 4,800
19 Receive inspection and obtain compliance report 3 days ALL 48,000 (0.12% of the investment value)
20 Request and obtain occupancy permit 30 days ALL 5,000
21 Register property with the Immovable Property Registration Office (IPRO) 15 days ALL 3,420 (ALL 3,000 registration fee + ALL 300 service fee + ALL 120 mailing fee)